|
« drywall day -1 |
Main
| drywall day 2 »
August 9, 2006
we have a drywall crew in the house
It is always weird to have contractors in the house. We generally like them as people and *love* having the work done, but there is always anxiety when there are other people banging around down there.
There are 3 rooms, the foyer, and a small hallway to drywall. The ceilings are 11 1/2 high, the front room has a 3-sided bump-out, and not one corner is going to be square. The man that gave us the quote, Ricardo, said that the hanging should be done in one day, though; accomplishing this would be impressive.
It would take us 6 months to do this and completely break us.
There are 3 guys here and they've started in the back. When I passed through to get a coffee refill, one guy was up on stilts, one guy appeared to be running material for stilt guy, and the 3rd man was using a ladder in the space in front of the bathroom. Forty minutes ago, the ceiling in the dining room had been hung and most of that room's 2-window wall, and part of the hall in front of the bathroom.
There is Spanish-language melodramatic pop music coming from the front room, sawing sounds from the hallway, and *much* banging from the back. Sometimes one of the guys sings along for a line or two.
At this rate, they really will hang it all today...
R. is at work and has the dog. Good thing, too -- he would be *pissed* by all of the unseen noises.
Posted by john m at August 9, 2006 10:34 AM
Comments
They *very suddenly* started hammering directly under where I am sitting. The cat on the coffee table jumped like 2 feet straight up...
Posted by: John at August 9, 2006 11:21 AM
Please take photos when they leave and post an update. "R" was so excited yesterday that she has me excited to see it, too!
Posted by: Meredith at August 9, 2006 11:49 AM
They're still here! These guys are working so hard that I almost feel bad about myself...
Posted by: John at August 9, 2006 6:43 PM
Post a comment
|